Sunday, July 02, 2017

Modern Farmhouse at 285 Martin Drive

 But it used to be mid century modern. (Using the term “modern” kinda liberally.)

We are now at the end of Week 17.  Remember this? Circa 2016.


This is us, circa 2017 (so far):


Sure, sure… the landscaping could use a face-lift now. But all in good time.  I have a plan for that too – almost… kind of… maybe.


First, the update from last week:

The drywall arrived, was apparently delivered via the upstairs windows and lay in stacks against the walls in almost every room. I was sorry to have missed this adventure, but plenty of the neighbors witnessed it and were eager to recall.



The team of 3 drywallers arrived last Monday and began sticking it up in earnest. it was hot, dusty and heavy work and they took few breaks. But oh boy, when they did, you should have seen what other skills they possess! They pulled out an electric cooking element, a fry pan and all the ingredients needed for what appeared to be fajitas… cooking and eating them in my upper living room among the dust and going right back to work!!!  Im NOT kidding!











By the weekend the drywall was all installed.  The guy below showed up around 7am on Saturday morning with the goal of taping the entire house. I think he almost did it too! I visited (made a nuisance of myself) as he happily worked alone Saturday afternoon, to the sound of Spanish radio. Fiesta music! One can’t help but catch the rhythm and smile.  Sunday, he was back to do the corners and where the walls meet the ceiling with a different yet equally compelling device. His young son was helper extraordinaire. Adorable and hard working.










Meanwhile at “date night” down at Floor And Decor this week, Mark and I were getting our tile on. Torturing ourselves with the infinite possibilities and geometric patterns. Ugghhh… by far the hardest of the decisions to date has to be picking tile for the bathrooms. Help, Ken. Help!




And outside the house this week, they were getting ready to paint. An ongoing caulking event, followed by taping the windows on the other side of plastic. Then, when I was not looking, the spraying began.  A color that was chosen by Mark and I just 48 hour prior after careful deliberation and hauling sample boards all around the house in diminishing evening light!  Yep, Ken had made me color sample boards and Aaron stayed late to help us with the task of getting some perspective!




Also this week; A little roof over the front peaked window and the doors off the master bedroom.




Painting the exterior began Friday afternoon.






And last but not least, our weekend visit. A chance to say hi to the neighbors, check out the modern farmhouse and water the trees.  (I was reminded this week, by someone in the know, that I should be giving them more water or they will suffer distress during this process.)


Friday, June 23, 2017

Ahead of Schedule - What?!

 Our Martin Acres pop-top is zooming along!

We have just ended week 16 of our Martin Acres pop-top project (if you also count the couple of weeks in early March spent preparing to start.) You can only imagine my surprise when Ken told me that we are presently a couple of weeks ahead of schedule, when we met this week. I could have cried with happiness!  Essentially this last week has seen crazy amounts of insulation and siding work being done and our pop-top is racing toward the finish line.

On the outside the guys finished the cement board and the battens – or as I call them, the stripes. They also braved wobbly ladders and planks to reach the height of the peaks and up went the lapboard. Is that the right term? Anyway, it’s the horizontal siding that you see overlapping each other, in the upper triangle areas.

The next step is caulk and prep to paint. LOTS of caulk I imagine!  We can expect to see paint in the next 2-3 weeks so I better get a move on choosing the off-white paint color.





On the inside, during back-to-back days that hit 100 degrees before lunchtime and sustained that temperature well into the night, the insulation team filled all the ceiling and wall spaces with batting and foam and such. Honestly, I worried for their health! It was dusty, foamy, itchy and hot. The house was a sauna upstairs and they had to wear long pants and sleeves, masks and goggles. The older guy even trotted around on stilts!!!











Saturday, June 17, 2017

City of Boulder Rough Inspection

 285 Martin Drive passed rough inspection!

It has been a busy week, but on the outside looking in, not a lot of apparent progress. Yeah, it’s hard to take pictures of another 20 feet of wiring and post about it!

Hard at work have been the HVAC teams, electricians and plumbers though. Every wall of framing has been punctured and threaded. Ducts are in place, wire connects outlets, light switches and fan hubs. CAT6 bundles terminate under the stairs and the other day I found a tub in the upstairs guest bath with actual water in it… not the kind that fell into the house from the sky, like last month either.







On the outside, we have the beginnings of siding too. Cement board has been cut and fit to cover the white paper that you’ve grown to love as much as I have. Following that, the vertical straps are being attached every couple of feet and the windows are being trimmed. And … ta-da! Balcony makes its first appearance.







They tell me painting is only about 3 weeks away. Between now and then there is a 50 pounds of caulk to apply, I’m sure!

Did I tell you the sliding door was now in the master bedroom? And that the first time I tried to open it I noticed the panes were bowed and it didn’t slide as easily as it should?  Oh dear! The Jeld Wen rep has been summoned and the problem diagnosed. Something about their construction and the need to be altitude-appropriate… which they were not.  I’m expecting new  doors in that frame, not long after the broken window – which Ken referred to as the eyesore!  LOL  At least we are still on the same page!

Speaking of…

How many of you have done a project like this and can say they are still on budget and time, at the half way mark?  I’m $300 over, according to our little spreadsheet. That’s not bad.  Of course, the price of drywall went up 15% last month and there’s not much that can be done about that, so it will most certainly affect the budget next month.  But still… I’m impressed with Storm Form, LLC.

Side Note: My “job” during this process is to make decisions. Sounds like fun, right? Most days it is. Some days I’m ever so slightly overwhelmed by my power and how in demand I am 🙂  Essentially, I have homework. In the evenings I look at garage doors, front doors, faucets and tubs. June has probably had the UPS guy scratching his head, as no less than 15 parcels have arrived to the front doorstep of the Longmont house! 




Tuesday, June 06, 2017

The Inner Workings of Construction

 From the outside looking in, the last week appeared pretty uneventful. Do not be fooled! 285 Martin Drive was a hive of activity. Never has it been more crowded with contractors and several of them (Eric, doing HVAC and Kevin, leading the plumbing team) worked weekends to stay on schedule. 

Dirk and Aaron built stairs – actual stairs, this week! And for the first time, I was able to take my neighbor, Donnie, for a glimpse of the second level.







Martin Acres construction forges ahead: The electrical got installed. 




Wiring diagrams are like secret code, if you ask me. It takes a special person with lots of highlighters, to understand exactly what needs to be done. I was on hand to answer questions, but I dreaded the times I was put on the spot when Ken wasn’t around. What if I gave the wrong answers? 

And plumbing… coming in and out. Hello 1955 cast iron pipe! 


After hours spent in my damp, dark crawlspace, only 3′ high, these guys were STILL smiling! I guess they didn’t run into my black widow friend down there.

On the outside the soffits under the eaves were being installed last week too.



 I have so many feel-good stories already, but here goes another:

Memorial Weekend, I decided to spend a half day trimming and thinning the junipers and other bushes along the back fence line. I had a pretty heavy duty lopper with long handles for leverage and I was making decent progress – if you judge it by the piles of branches chopped rather than the skill in manicuring trees into shape! At some point I noticed the lopper becoming increasingly difficult to open and close…. Then it was downright impossible.  Had I bent a blade? Eric was just finishing HVAC work when he noticed me struggling in the back yard and volunteered to use his van load of tools to make my tool functional again. Within minutes he had loosened, oiled and tightened my gardening implement and it was normal again. So nice!  

I know some people think it’s enough to have efficient, timely and reasonably priced contractors working on your house. It is…kind of. But take it to the next level and imagine all the good energy that is being built right in when you have teams of folks who are jovial, enthusiastic and seem to really care about working well with each other, making it easy for another person, keeping each other on schedule and in the loop with progress and changes. 


There is a reason I am drawn to 285 Martin Drive. You’ve heard me rave about the great neighbors but now you can add the attractive, positive energy at the job site. I find myself with the occasional hour or two of down-time between appointments and these days, am likely to be found in an old chair on the front patio, watching the world go by as I work via hot-spot with a laptop in hand.

… Or at breakfast with Mark on a Saturday morning.


Wednesday, May 31, 2017

Storm Form goes above and beyond... again

Using the "conveniences" at 285 Martin Drive is NOT convenient!

Yesterday was just one more example of how well I feel taken care of by the guys of Storm Form. Every job site needs a potty and for a while my house had a couple of bathrooms, so that worked well. But the first one was removed in March and the second… sometime in April?  I admit that I never noticed the day that the powder room was removed. The house was a mess, the dumpster full of what used to be my pride and joy – 285 Martin Drive – and when one more room became “open air” I guess it just slipped by me. 

It wasn’t until a week ago, hopping around with a full bladder and lamenting the fact my neighbor was not home and I needed to use her loo, that the “bathroom situation” at 285 Martin Drive was explained to me. The toilet in the powder room (now the back end of the garage) was still there… behind the hanging black plastic sheet! In an effort to save the cost of a port-a-loo for another month, they were making do with what they had. Ken didn’t think I’d appreciate it for what it was though and advised an alternate solution be found.

I never used that toilet, or even dared look behind the plastic! The bathrooms at King Soopers seemed like more my style. Which is something you won’t hear me say very often.

Anyway, all good things must come to an end and the last toilet (with its plastic wall) was removed from 285 Martin Drive this week, which meant, it was time for a portable toilet delivery.

A little background: It has rained a LOT here in the past few weeks. The ground is soft and this is a great time of year to dig through clay if needed. I used last Sunday to do a little excavating of my own and widened the front path to the house. Spending a couple of hours there, I dug up the old flagstone, the irrigation system and my xeriscape plants, 10 years established. The path was now 6′ wide. And apparently that is wide enough for a port-a-loo because…

Tuesday morning, bright and early the toilet arrived. Instead of putting it at the top of the driveway as requested, the delivery people put it here; one foot from the sidewalk!


I had several “first thoughts”

  1. Will this encourage random joggers, slightly intoxicated new grads and small kids on the way to the park, to use our potty?
  2. Will children, dog walkers and neighbors be able to hear the workmen using the potty?
  3. I’m no whiz with the shovel and the work I did on Sunday is not going to win awards for being level. In fact there is a step, by design, now under the potty! Could the potty tip over if the occupant was not careful?

Interestingly, while Ken and I laughed about it’s unusual placement he told me he had asked the potty delivery folks to come back and put it in a less conspicuous place. One of his reasons…. Because the home owner was into taking pictures of the house project and the potty placement would be bad for pictures.

So thoughtful!